Offshore Installation & Decommissioning

Offshore platform installation, deck installation, platform removal and reefing in the Gulf of Mexico, plus offshore wind foundation installation.

Description

Manson works with oil and energy customers in the Gulf of Mexico on deep-water installation and removal work using derrick barges such as E.P. PAUP and WOTAN. The company also transported and installed the foundations for the Block Island Wind Farm, the first commercial offshore wind farm in the U.S.A.

Key features

  • Installation of a 500-ton tripod jacket in 280 ft. of water
  • Deck installations
  • Removal of 4-, 6- and 8-pile platforms with jacket reefing
  • Loading a 350-ton blowout preventer onto a drillship

Applications

  • Offshore oil and gas platform installation and decommissioning
  • Offshore wind foundations: 110-ft. tall, 400-ton jackets with 60-in. diameter piles driven 150 ft. into the seafloor

Specifications

Tripod jacket installed500 tons in 280 ft. water depth
Wind jacket height110 ft.
Wind jacket weight400 tons
Pile diameter60 in.
Pile penetration150 ft.