Liferaft Systems Australia Installation & Commissioning
Installation Support
Installation drawings and support; a typical MES installation takes 1-2 days.
Description
Each installation is accompanied by detailed drawings from the LSA Design Department, prepared with the ship owner, shipyard or designer. A typical installation takes only 1-2 days with minimal disruption to newbuild or repair programmes.
Key features
- No winches, hydraulics or connection to ship's power required
- Fixed-length bowsing lines pre-determined by the design team
- Unit can be installed inside the main passenger area or on an open deck
More from Liferaft Systems Australia
Featured services
All services →Engineering & Design
Graving Dock Caisson Gate Design
Design of replacement caisson gates and engineering support for graving (basin) drydocks, including naval shipyard gate replacements and basin dock recertification.
Other service
Commercial Diving
In-house certified commercial diving including surface/mixed-gas diving to 299 ft and saturation diving 250-1200 ft; ADCI member with company-owned equipment.
Other service
Cannes Yachting Festival
Six-day in-water boat show each September in the Vieux Port and Port Canto, Cannes; the 2024 edition showed more than 700 boats of 5 to 45 metres.