DEME installs inter-array cables and scour protection for offshore wind farms, using its fallpipe vessels and purpose-built trenching equipment.

Key features

  • At Merkur, DEME managed the engineering and fabrication of 73 copper-cored 33kV inner array cables (83 km total)
  • Cables were laid with the converted fallpipe vessel *Flintstone*, then terminated and buried 1 m below the seabed with a tailor-made trencher deployed from the fallpipe vessel *Rollingstone*
  • At Rentel, DEME designed and installed a two-layer scour protection system: a filter layer placed before foundation installation and an armour layer after cable pull-in

Applications

Offshore wind farm array cable installation, cable burial and scour protection around foundations.

Specifications

Merkur inner array cables73 x 33 kV copper-cored, 83 km total
Burial depth (Merkur)1 m below seabed