Ballard Marine Construction Repair & Overhaul
Maintenance
Topside marine and underwater maintenance and repair of infrastructure, systems and facilities with limited or no downtime.
Description
Ballard provides topside marine and underwater maintenance and repair to extend the life of infrastructure nationwide. Crews assess, maintain and repair infrastructure, systems and facilities with limited or no downtime, and the workforce scales by craft for unplanned service. Planning and logistical services are tailored to project type and client goals.
Key features
- Traveling screen rebuilds, intake cleaning and trash rack cleaning
- Log boom maintenance and ROV inspections of intakes
- Collector well maintenance
- Wastewater system and pump house maintenance and repair
- Invasive species and zebra mussel remediation
- Intake crib inspection, construction and repair
Applications
Referenced projects include Big Creek 6 Dam, Terminal 5 Rehabilitation, SR99 Tunnel, Suez Canal Tunnels, Hanford Nuclear Facility Spray Pond Dredging and Cheesman Dam Emergency Hydraulic Refurbishment.
More from Ballard Marine Construction
Featured services
All services →Rental / Leasing
Staff accommodation
Living quarters for the workforce of companies operating in DMC, with a new 1,406-room, 113,935 sq.m facility connected to the industrial district housing over 8,000 men and over 900 women.
Engineering & Design
Vessel Handling Trolley System Design
Design of vessel handling trolley systems for floating and graving drydocks, including standard non-mechanical trolleys and hauling and centering trolleys with winches.
Other service
Cannes Yachting Festival
Six-day in-water boat show each September in the Vieux Port and Port Canto, Cannes; the 2024 edition showed more than 700 boats of 5 to 45 metres.