Neodrill Installation & Commissioning
CAN-complete
Full-service EPCI for CAN installations, from soil-specific design to organising the installation vessel and executing installation.
Description
CAN-complete is Neodrill's lean Engineering, Procurement, Construction and Installation (EPCI) service for the subsea well top-hole and structural foundation. Neodrill manages all aspects of a CAN project, from adapting the CAN to soil conditions to organising the installation vessel and executing the installation, working with partners and selected key suppliers.
Key features
- Single point of responsibility, reducing interfaces with multiple suppliers
- Neodrill estimates up to 50% lower cost for top-hole and structural foundations
- Cut-and-recover services: surface casing cut from a vessel with a casing cutting tool during abandonment
- Multi-client campaigns offered where possible
Applications
- Subsea exploration, production and abandonment campaigns using CAN technology
More from Neodrill
Featured services
All services →Consulting
Technical Support
Support across the selective plating process, from process and application development to troubleshooting and testing procedures.
Other service
Cannes Yachting Festival
Six-day in-water boat show each September in the Vieux Port and Port Canto, Cannes; the 2024 edition showed more than 700 boats of 5 to 45 metres.
Inspection, Survey & Testing
General Dynamics Mission Systems
Open Water Acoustic Testing Facility
Progeny Systems open water acoustic test facility in Gloucester, Massachusetts, performing flow and high-frequency acoustic measurements of transducers.